Track 2000Case 4: On schedule, under quality and in troubleIn Figure 8, a project has a high Return on Investment [$200,000] but development costs are blowing out. To keep them within budget the team degrades the quality of the system. As a result, the support costs are blown out from $100,000 to $250,000 and the expected Return of Investment is reduced to $50,000.
Fig 8. In schedule and Not OK |