Track 2000Case 5: Behind schedule, over cost and fineIn Figure 9, a project has a high Return on Investment [$150,000] based on estimates of development costs of $100,000 and suport costs of $100,000 but faced with potential development cost blowouts the team has two options.
Option 2 results in a better Return on Investment of $70,000 than Option 1. However, the team would be shown as behind schedule and over budget in traditional tracking reports.
Fig 9. Behind Schedule, Over Cost and Fine |